Contractor suing SRNS for nearly $20 million

  • Posted: Thursday, June 20, 2013 5:08 p.m.
    UPDATED: Thursday, June 20, 2013 5:27 p.m.

A concrete construction firm is suing Savannah River Nuclear Solutions for nearly $20 million in damages that they allege are related to design changes for a facility at the Savannah River Site.

Baker Concrete Construction Inc. filed a civil suit dated June 6 that alleges Savannah River Nuclear Solutions misled the firm about the status of design completion on a $90 million plutonium and uranium waste-disposal project underway.

Baker alleges multiple cases of fraud in its complaint, and that Savannah River Nuclear Solutions "knowingly released inadequate and outdated drawings, plans and specifications" for the bid, according to the suit.

Pick up a copy of Friday's Aiken Standard for more information on this developing story.

Comments { }

Commenting rules: Do not post offensive, racial or violent messages. Responsibility for the statements posted lies with the commenter, not www.aikenstandard.com. Click 'report abuse' for any comments that you feel should be removed from the site. However, www.aikenstandard.com is not obligated to remove any comment posted on the site. Moderators do not have the ability to edit comments. Read the terms of use.